View Single Post
  #16 (permalink)  
Old 07-03-2008, 12:35 AM
lewis's Avatar
lewis lewis is offline
6x6 World Sponsor
 
Join Date: Mar 2008
Location: Rockwell, N.C.
Posts: 382
lewis is on a distinguished road
Mount

100_0540 obmm.JPG 100_0531 obmm.JPG


Tube is 1.25 square tubing. (do not know the wall thickness)
Bracket is set 13 inches from light.
Square tube length is 15.25 with diamond offset.
tube attachment flat stock is 5.25 and 90 to frame is 3.0 inches with to 5/16 bolts at hitch to frame. 3/16 steel for this part.
Motor mount plate is 9.25 inches long with 2.50 deep to 3 point weld.
Motor mount back plate is 4.50 inches (all plating is 1/8 steel)
Plywood mounting plate is 1 and 3/16 inch.

Angles are noted: first pic is to set back plate at 75 degrees with angle meter as pictured. This is a ruff estimate since i am not completely level due to the vehicle design. Rear wheels about 1 inch off ground in rear.

Square tubing is set at 70 degrees on angle meter and welded in diamond position. I am sure you know what i mean by this.

Hope this helps . I mound a 9.9 4 stroke on this and is pretty sturdy set-up. I am positive a trolling motor will be o.k. on this application. Good luck:

Lewis
Reply With Quote