![]() |
|
|||||||
| Argo ATVs Forum for discussing Argo ATVs from the Vanguard and Frontier 6x6 to the Response and Avenger 8x8! |
![]() |
|
|
LinkBack | Thread Tools | Display Modes |
|
||||
|
Mount
100_0529 obmm.JPG
100_0530 obmm.jpg 100_0532 obmm.JPG 100_0533 obmm.JPG 100_0534 obmm.JPG Here are 4 pics, all i could send this post. I have measurements. lewis |
|
||||
|
100_0535.JPG
100_0536 obmm.JPG 100_0537 obmm.JPG 100_0538 obmm.JPG 100_0539 obmm.JPG One more to go. |
|
||||
|
Mount
100_0540 obmm.JPG 100_0531 obmm.JPG
Tube is 1.25 square tubing. (do not know the wall thickness) Bracket is set 13 inches from light. Square tube length is 15.25 with diamond offset. tube attachment flat stock is 5.25 and 90 to frame is 3.0 inches with to 5/16 bolts at hitch to frame. 3/16 steel for this part. Motor mount plate is 9.25 inches long with 2.50 deep to 3 point weld. Motor mount back plate is 4.50 inches (all plating is 1/8 steel) Plywood mounting plate is 1 and 3/16 inch. Angles are noted: first pic is to set back plate at 75 degrees with angle meter as pictured. This is a ruff estimate since i am not completely level due to the vehicle design. Rear wheels about 1 inch off ground in rear. Square tubing is set at 70 degrees on angle meter and welded in diamond position. I am sure you know what i mean by this. Hope this helps . I mound a 9.9 4 stroke on this and is pretty sturdy set-up. I am positive a trolling motor will be o.k. on this application. Good luck: Lewis |
|
||||
|
Dirty machine
Cougar, if you need anything else as far as measurements let me know.
My machine was pretty dirty i have not had the chance to clean it up this week from the weekend ride. Just thought i would add this, i normally keep it very clean.Lewis |
|
||||
|
Quote:
![]() Thanks for the help that should get me going. Cougar |
![]() |
| Thread Tools | |
| Display Modes | |
|
|