jerseybigfoot
Skunkworks
Registered: June 2007 Location: Central NJ Posts: 1,470
|
On the Job site at the University of Maine Offshore wind turbine lab Big steel and concrete structure is 6.5 million lb mount for Blades. Steel mounting pas is 2 pieces of 6" thick steel welded together with spacer tubes. The plates are held to the condrete with a masive amount of rebar. 60 million lbs of torque can be applied to the block.
|