2006 Argo Avenger with T20

  1. Welcome to 6x6 World.

    You are currently viewing our boards as a guest which gives you limited access to view most discussions and access our other features. By joining our free community you will have access to post topics, communicate privately with other members (PM), respond to polls, upload content and access many other special features. Registration is fast, simple and absolutely free so please, join our community today!

    If you have any problems with the registration process or your account login, please contact us. Looking forward to seeing you in the forums and talking about AATVs!
+ Reply to Thread
Page 8 of 19 FirstFirst ... 6 7 8 9 10 18 ... LastLast
Results 71 to 80 of 188

Thread: 2006 Argo Avenger with T20

  1. #71
    Join Date
    Mar 2008
    Location
    Rockwell, N.C.
    Posts
    2,627
    I can't wait to see this Avenger!
    Life should not be a journey to the grave with the intention of arriving safely in an attractive and well-preserved body, but rather to skid in sideways , cigar in one hand, whiskey in the other, body thoroughly used up, totally worn out and screaming "WOO-HOO, what a ride!!!"

  2. #72
    Join Date
    May 2007
    Location
    Kings Mountain, NC
    Posts
    7,788
    Tonight, I installed the intermediate shafts back in the Argo. The splines have been extended to allow me to slide the sprockets further towards the outside of the Argo. This was needed to line up with the T20 output shaft sprockets since the T20 is wider than the stock Avenger transmission.

    Sprocket slid all the way towards the transmission


    Sprocket slid all the way towards the outside of the Avenger


    Here are a couple of older photo where you can almost make out the length of the original splines for comparison


    I also placed orders for lots of small parts I needed and picked up some DOM tubing to make the laterals and the linkage.

  3. #73
    Join Date
    Jun 2007
    Location
    Buffalo, NY
    Posts
    6,442
    Looks great, Mike! That DOM tubing is expensive stuff, and the more you need, it seems to REALLY add up quickly. I can't believe how fast this project is coming along.
    "Looks like you have a problem with your 4 wheeler........you're missin' two wheels there"

  4. #74
    Join Date
    May 2007
    Location
    Kings Mountain, NC
    Posts
    7,788
    Updating this thread is helping to keep me moving forward. I feel like I made some decent progress today.

    I machined the hole in the T20 case halves for a press fit to allow me to press in 3/8" dowel pin / pivot point for the new popsicle stick style levers. I started with a 1/8" bit and drilled completely through the case with it.


    Then I went to an undersized drill bit and finished the hole out with a slightly undersized reamer as well. With the large hole, I only drilled to the bottom of the boss. I have to order some longer dowel pins, otherwise I would have gone ahead and pressed them in.


    After I got the holes machined in the T20 case, that allowed me to mock up the new lever that I made. I cut out this lever just for mock up. The bottom of the lever was extended about 2" compared to the stock ones to allow me to position the linkage that will go to the laterals right below the T20 mount. In these photos, I am using heim joints instead of eye bolts in the T20 plungers so they throw the lever at a slight angle. Also, the dowel pin is just sitting in the hole. Both of those will be changed but this was mainly to make sure the lever was extended to the right position. Now that I know it is, I will machine out two more levers and have them hardened.


    Finally, I started making the motor mount that will sit on top of the existing transmission mount that I've already finished. In these photos I have most of it tacked together. As you can see, the bottom mount is slotted to allow this top motor mount to slide forwards and backwards for proper belt tension. Once I weld this up, a final plate will be welded to the top. That plate will be offset towards the clutch side of the motor for proper belt alignment. The top plate will also have slots machined in it to allow the motor to be slid from left to right for fine tuning of the belt alignment. Depending on how far the plate has to be offset I may end up having to add a "leg" under it to support the weight of the motor. I won't know for sure until I get the T20 back together and in the mount so I can line up the clutches and mark the holes needed for the motor mount.

    This photo shows the motor mount slid all the way forward.


    This photo shows the motor mount slid all the way to the rear.

  5. #75
    Join Date
    May 2007
    Location
    Kings Mountain, NC
    Posts
    7,788
    I didn't get but an hour or so tonight to work on the Argo but I did manage to get a couple of small things done.

    I started by bending the 7/8" DOM tubing for the laterals. I am going to try out some horizontal bars this time to see how I like them. I am probably going to try out a thumb throttle too. For now I made both ends of the handlebars longer than needed. I will cut them down when I get further along.


    I will also probably weld them at a slight angle to match the stock Avenger bars as they are pretty comfortable.


    I scratched my head for a while on different solutions for mounting the T20 linkage to the laterals. Since the T20 moves up to tighten the output shaft chains, I needed a way to move the linkage mounting point up with it as well. Tonight I welded a tab on a wide two-piece collar and I think that is going to work well.

  6. #76
    Join Date
    Mar 2008
    Location
    Rockwell, N.C.
    Posts
    2,627
    Looks great Mike!
    Life should not be a journey to the grave with the intention of arriving safely in an attractive and well-preserved body, but rather to skid in sideways , cigar in one hand, whiskey in the other, body thoroughly used up, totally worn out and screaming "WOO-HOO, what a ride!!!"

  7. #77
    Join Date
    May 2007
    Location
    Kings Mountain, NC
    Posts
    7,788
    Some more parts arrived this week so I was able to make some progress today. I started by pressing a 3/8" x 2" dowel pin into the T20 case halves. I used an arbor press to press them in. I also used some green Locktite retaining compound just for added insurance that they would stay put.



    I had ordered some eyebolts to use in the T20 plungers and they arrived. The only ones I could find were too long so I cut them down and used a die to clean the threads. I installed them and they were a little too thick. They caused the popsicle stick lever to be at an angle instead of being parallel with the case. So I machine the face of the eyebolts down about 1/32" each and that put the levers parallel with the case.

    Once I had the lever where I needed it, I machined out some spacers to fill the void between the boss on the T20 case and the levers themselves. The old style T20 cases had longer bosses that extended all the way to the levers. The newer C-channel cases have shorter bosses to accommodate the extra width of the C-channel levers. For mockup, I used some bolts through the eyebolts but I will be using clevis pins in the end to hold the levers in place.



    The main bracing for the motor mount is now finish welded. I have to wait to get the T20 back together before I can build the top plate as I will have to align the clutches to locate the motor.

  8. #78
    Join Date
    Jun 2007
    Location
    Central NJ
    Posts
    1,470
    looks similar to what I made for my copperhead a couple of weeks ago less the case mod.
    Acta non verba

  9. #79
    Join Date
    May 2007
    Location
    Kings Mountain, NC
    Posts
    7,788
    Quote Originally Posted by jerseybigfoot View Post
    looks similar to what I made for my copperhead a couple of weeks ago less the case mod.
    Marc, it was funny. I was picking on your black oxide rod ends in a comment under your photo several days ago. Well, I went to order mine and the black oxide ones were the only ones I could find from the couple of places I was already ordering parts from.

  10. #80
    Join Date
    May 2007
    Location
    Kings Mountain, NC
    Posts
    7,788
    Today I managed to assemble part of the T20. I have a bent output shaft on the other side of the T20 so I have to order a new one before I can finish assembling the transmission. By assembling the left (input shaft) side of the T20, that allowed me to slide the clutch on and mock up the placement of the engine with the belt. Then I marked the location of the engine mounting bolts and machined out slots in the engine mount to allow for side-to-side adjustment of the T20 for proper belt alignment.


    I also ordered a throttle to try out on the Avenger. It is called the dual gasser throttle. It has a twist throttle and a thumb throttle. The twist throttle is lockable so that it does not rotate when you want to use the thumb throttle. I had been searching for a unique throttle for a while when I stumbled upon this one. There weren't many specifications on this throttle online but I took a gamble and ordered it anyway. I haven't torn it apart yet to see if I can make it work with a throttle cable for the Briggs motor but I'm sure it will be fine.

+ Reply to Thread

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts