I finally got back to my project removed the idler shafts and flipped over frame. As you can see I am starting from the bottom. I have some grinding,welding , and a lot of sandblasting to do. I need to replace two 1 1/4 in. cross members also. What thickness should the floor pan be ? Thanks 100_0686.jpg
100_0687.jpg
100_0690.jpg
100_0691.jpgTim
100_0687.jpg
100_0690.jpg
100_0691.jpgTim